Maximilian Remmele

Maximilian Remmele, Team Leader Process Planning / Time Management, Kramer-Werke GmbH


Variable timing in a multi-variant pre-assembly line

Process times of activities are recorded and an increase in efficiency is achieved. By recording all process steps with MTM, efficiency can be further increased thanks to a clearly detailed and transparent database. However, the clocking with a fixed cycle time in a multi-variant assembly has its limits in terms of the possible capacity utilization of the employees. As a solution to this challenge, the idea of using variable takting in a pilot area and testing its possibilities and limits was born.
As the basis for variable cycle time is a constant flow, various conveyor systems are considered in the first step. A train chain will then be installed in the pilot area at the turn of the year 2023/2024. From March 2024, the variable cycle starts in the pilot area and has been in use ever since. The calculated potentials were achieved.

Vita

Studied (Bachelor and Master) at the HTWG Konstanz in the field of mechanical engineering.
Bachelor's thesis and Master's thesis at Kramer-Werke GmbH in the field of lean management.
With the start of MTM at Kramer-Werke GmbH and Wacker Neuson in 2019, the change to work preparation to take over the management of the MTM team.
In October 2021, additional responsibility for new planning and series production support.